| |||||||
Europe
North AmericaSouth AmericaAsiaAustralia and OceaniaAfrica |
Смотрите также: Severn Bridge The Severn Bridge (Welsh: Pont Hafren) is a suspension bridge spanning the River Severn between South Gloucestershire, just north of Bristol, England, and Monmouthshire in South Wales, via Beachley, a peninsula between the River Severn and River Wye estuary. It is the original Severn road crossing between England and Wales and took five years to construct at a cost of £8 million. It replaced the Aust ferry. Severn Bridge Crosses River Severn River Wye Locale South West England / South Wales Design Suspension bridge Longest span 3,240 ft (988 m) Vertical clearance 445 ft (136 m) Opening date 8 September 1966
The bridge was opened on 8 September 1966, by Queen Elizabeth II, who hailed it as the dawn of a new economic era for South Wales. The bridge was granted Grade I listed status in 1998. History The first proposal for a bridge across the Severn, approximately in the same location as that eventually constructed, was in 1824 by Thomas Telford, who had been asked to advise on how to improve mail coach services between London and Wales. No action was taken, and over the next few decades the railways became the dominant mode of long-distance travel, with the Severn Railway Bridge at Sharpness being opened in 1879 and the main line Severn Tunnel in 1886. However, the growth of road traffic in the early 20th century led to further calls for improvements, and in the early 1920s Chepstow Urban District Council convened a meeting of neighbouring local authorities to consider a Severn crossing to ease congestion and delays on the A48 passing through the town. In 1935 Gloucestershire and Monmouthshire County Councils jointly promoted a Parliamentary Bill to obtain powers to build the bridge over the estuary, with 75% of costs to be met by the Ministry of Transport from the Road Fund. However, the Bill was rejected by Parliament after opposition from the Great Western Railway Company. After World War II, plans began to be made for a nationally funded network of trunk roads, including a Severn Bridge, for which the contract was awarded to Mott, Hay and Anderson, with Freeman Fox and Partners. The public enquiry into the scheme was held on 24 September 1946 at Bristol university. However, because Government funding was prioritised for the similar Forth Road Bridge (opened in 1964), construction of the Severn Bridge was not started until 1961: the UK government announced in 1962 that construction costs would be 'recovered' by means of a toll of 2s 6d (GBP 0.125) on all vehicle crossings, though walking or cycling across the bridge would be charge-free. The substructure was completed by contractors John Howard and Co in 1963. The superstructure contract was awarded to Associated Bridge Builders Ltd in 1963, and completed in 1966. In parallel, the Wye Bridge was built by Cleveland Bridge & Engineering Company. Comments: 0 |
|