New River Gorge Bridge
Crosses New River, CR 82 , CSX railway
Locale Fayetteville, West Virginia, United States
Design Arch
Longest span 1,700 ft (518.2 m)
Total length 3,030 ft (924 m)
Width 69.3 ft (21.1 m), 4 lanes with center divider
Clearance Vertical
Deck Arch, unlimited clearance
Clearance below 876 ft (267 m)
Opening date October 22, 1977
History
Construction began on the bridge in June 1974, and completed on October 22, 1977. It was designed by the Michael Baker Company, under the direction of Chief Engineer Clarence V. Knudsen, and executed by U.S. Steel's American Bridge Division. Final cost of construction was $37 million (approximately $4 million over bid). It is made from Cor-ten steel. The use of Cor-ten in construction presented several challenges; notable among them was ensuring that the weld-points weathered at the same rate as the rest of the steel.
Many locals say, with little exaggeration, that completion of the bridge cut the travel time from one side of the gorge to another from 45 minutes to 45 seconds.
- | http://bestbridge.net/NorthAmerica_en/new-river-gorge-bridge.html | |
Главная страница сайта «Мосты» | - | http://bestbridge.net/index.php |