Uddevalla Bridge
Crosses Sunninge sound
Locale Swedish municipality of Uddevalla
Design Cable-stayed bridge
Total length 1712 m (5617 ft)
Width 2 vehicular lanes in each direction
Longest span 414 m (1358 ft)
Clearance below 51 m (167 ft)
Opening date May 20, 2000
Construction notes
Structural engineering for the bridge was carried out by Johs Holt AS, and Skanska Teknik AB. Skanska AB also served as general contractor, with subcontractors Alpin Technik und Ingenieurservice GmbH (general), VSL International (cables), mageba (bearings), and PERI GmbH (Formwork and Scaffolding)
The cables are steel and the deck is composite steel-reinforced concrete, while the pylons are reinforced concrete. About 9,000 metric tonnes of structural steel and 35,000 cubic meters of concrete were used. The Skanska site (linked below) gives a project cost of SEK 723 M/ USD 85 M in 2000 currency values. There is a problem with ice sticking to the cables in the winter, which can fall onto cars. The bridge has to be closed a few times per year for this reason. The alternative road is 12 km longer. Civil engineers have tested PETD (a way to use a burst of electricity to remove ice caked on walls or windows. For surfaces coated with a special film, the jolt gets rid of ice in less than a second, far less time than it takes to hack at it with an ice scraper.) and decided to cover the Uddevalla Bridge in a 12-mil-thick PETD foil to keep it from icing over.
- | http://bestbridge.net/Eu_en/uddevalla-bridge.html | |
Главная страница сайта «Мосты» | - | http://bestbridge.net/index.php |