Dom Luis I bridge
Carries Light rail (tramway) bridge / metro rail bridge Road bridge
Crosses Douro River
Locale Porto to Vila Nova de Gaia
Design Two-hinged double-deck arch bridge
Total length 385.25 metres (1,263.9 ft)
Height 44.6 metres (146 ft)
Longest span 172 metres (560 ft)
Beginning date of construction 1881
Completion date 1886
Opening date 1886-10-31
The Government held a competition for the construction of a metallic bridge on the Douro River on a site that was adjacent to an existing bridge and would replace it. Teófilo Seyrig had already engineered the D. Maria Pia Bridge project, whilst working as a partner of Eiffel. He now took sole responsibility for the new, major Luis 1st Bridge. The construction was begun in 1881 and the bridge opened on 1886-10-31.