Boyne River Bridge
Carries 4 lanes
Crosses Boyne River
Locale 3km west of Drogheda
Designer Roughan & O'Donovan
Design cable-stayed bridge
Total length 352.5m
Width 34.5m
Height 95m
Longest span 170m
Number of spans 6
Vertical clearance 20m
Beginning date of construction 2000
Completion date 2003
Opening date June 09, 2003
Overview
Designing a road bridge over the Boyne was not an easy task. At the chosen point, three kilometers upstream from Drogheda, the ground level on the south is elevated, with a sudden drop while the north bank slopes gradually down to the river. The area is environmentally sensitive, especially the reed beds on the north bank and the flora and fauna of Yellow Island in the middle of the river. The area has a rich heritage as it is also situated adjacent to the area in which the 1690 Battle of the Boyne took place.
The answer was a cable-stayed bridge. Although at a cost of 35 million euro it would be more expensive than a standard road bridge, it could incorporate a much longer main span without the need for supports in the river, so the engineers could protect the river and the island from any interference. It would also look attractive, with a tall pylon at the south side and cable stays fanning out from it, supporting the main structure.
- | http://bestbridge.net/Eu_en/boyne-river-bridge.html | |
Главная страница сайта «Мосты» | - | http://bestbridge.net/index.php |